PreProduction: Social Challenge Table Read



Week 8 - 6/12/16 10:20 am
We had a table read of the script for 'Social Challenge' the meeting was very helpful in outlining the structure of the show and actual content.

The script needs a lot of work eg - structure of rounds
Round 1 - Meme Challenge (3 rounds of images/video create a meme for then upload to instagram for likes, most likes wins)
Round 2 - Snapchat Stories (60 second story using selected theme, filters. Audience pick most funny - watch on phones/TV MONITOR)
Round 3 - Music.ly challenge both teams create 30 sec vid of the themed song 'All I Want For Christmas' Mariah Carey. Voting is the same.

The show is filmed live in front of an audience and their participation is key. We do not need pre recorded items, but need to source images that need to be shown as well as connection app to show what's happening live on their device.
We looked at apps and a wire to do this:
REFLECTOR App
HDMI Cable 2m (insert into TV Monitor).

I then assigned roles for production, discussing everyones strengths and efforts.

Director - Me
Vision Mixer - Berfin
Floor Manager - Maarya
Cam 1 - Timi
Cam 2 (Main)- Vic
Cam 3 - Abi
Sound - Zak
Lighting - Chai ann
Tech/Monitor - Keeley



Monday, 28 November 2016

PreProduction Social Challenge: Recce



PreProduction Social Challenge: Budget


PreProduction Social Challenge: Equipment List

Equipment checklist:
·         6 iPad ( 1 for extra)
·         3 cameras
·         Lighting
·         Sound
·         Tv Monitor
·         Applications (Snapchat, Instagram, Twitter)
·         Tripods
·         Control room
·         Recco Live

Equipment
Where it will be used?
Cost?
6 iPad
It will be used on the table
£1,300
3 cameras
Instead of using the cameras that broke down, we are going to use our iPads because our cameras broke down.

£15k-20k
Lighting
The lighting will be used In the studio
£2k
Sound
The sound will be in the control room
£5k
TV Monitor
The TV monitor is based in the control room.

Applications (Snapchat, Instagram, Twitter)
The applications are located on the iPads
Free
Tripods
The tripods will be located in the same positions as the cameras as well be placing the ipads on tripods.
£300-700
Control room
The control room is based behind the studio.
n/a
Recco live
We will use this application as a vision mixer as our main cameras went down. So our ipads are our substitutes.
$5












PreProduction Social Challenge: STORYBOARD






PreProduction Social Challenge: Set Design & SECONDARY RESEARCH

PreProduction Social Challenge: PROP LIST & SET DESIGN

PROP LIST:
6 BlackLeather SOFA CHAIRS - Another chair for presenter
6 IPADS
2 TABLES

TV SCREEN



Tv PreProduction: Social Challenge



Week 7 - 28/11/16 9:00am
This morning as a group we discussed deadlines and how it could be complete by Wednesday 30th . Berfin ask anyone who needed help or support with their pre-production and distribute any work between Victor, Maarya and Berfin as they are done.
Lighting Plan - Berfin
Proplist & Ident logo - Dani
Secondary Research - Dani

Tv PreProduction: Social Challenge



Week 6 - 15/11/16 10:20am
In this reporting meeting, we spoke about what had to be done and when.
Tasks that needs to be completed
Dani - Props list and set design( Including logos) & Secondary Research Evidence
Keeley- Primary Research Evidence , script
Victor -   Shooting- Camera Script
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Linking and inserts, script
Zak- Shot list, Logo
Abigail - Production Schedule, Lighting Plan

Tv PreProduction: Social Challenge



Week 5 - 14/11/16 9:00am
This morning we discussed what was complete for the pre-production.For an example, Berfin, Victor, Zak and Maarya was done with their individual task and started to work with other. Another example, Berfin is starting and designing the logo with Zak.
Complete Pre-production
Berfin  - Budget & Reece
Victor - Equipment & Reece
Maarya - Storyboard
Zak - Studio Floor Plan

TV PreProduction: Social Challenge



Week 4 - 09/11/16 11:10am
Today we discuss the main part of the pre-production as we had a deadline on the 14th of November. Everyone team member given a little update where they were on the pre-production. These are the preproduction areas that are ready.
Storyboard
Equipment check
Research evidence
Location recce

Tuesday, 8 November 2016

Tv PreProduction: Social Challenge

7/11/16
As a group we allocated eachothers roles and in this recent meeting we then discussed further into the tasks set for each role taking into consideration cross overs. 
My role for set design would allow me to do Secondary research into existing shows with a similar set up to our idea.

This week we decided as a group to give out individual task.
Dani - Props list and set design( Including logos) & Secondary  Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post),
Keeley- Primary Research Evidence , script 
Victor -   Shooting- Camera Script, Equipment checklist 
Maarya- Storyboard & Risk assessments
Chai-ann- Production Schedule & Shooting- Camera Script 
Timi - Location Recce, Linking and inserts
Zak- Shot list, Studio floor plans
Abigail - Production Schedule, Lighting Plan 

First Day In Studio. 1/11/16

1/11/16
The first day in the studio, we familiarised ourselves with all elements of TV Production. From
the control room, sound desk  to directors chair and the physical Set, of 3 camera set up, green screen and TV Monitor.

The Control Room:
Lighting desk - Turn up/down lights. Add lighting to suit shots.
Sound Desk - To combat between added music on vision mixer desk and added sound FX
Sound FX - Placed next to sound mixer, add sound fx to certain parts of programme would follow camera script.
Vision mixer - Sit with director and multiple assistants to switch cameras and VT.
Director - On call to the 'Floor manager' directing them what they want to happen for the production as well as camera men who have headsets on.
Producers - (Depending on size of production) Would be with director making sure all goes to plan

I began in the Control room on sound listening to the action on set from the mics of the presenters,  the setup was a touch screen with various sound Fx's to bring an aspect of reality into the programme. The group who were on set decided to do a 'Chat show' for a short role play, I used various sounds such as applause when introducing guests and at the end as well as explosion sounds when confrontations happened to add a comedic element.

Each side was 15 minutes my next role was Floor Manager, I was equiped with a headset and mic to speak to the director in the control room, they would give me direction to assist the camera men and all action on the production. Camera operators would have headsets on but are unable to speak back so would need to query with Floor manager.

On Set:
Camera Operator - Film the shots from Directors request and liaison with floor manager
Sound - Sound would be on hand with mics to capture sound from set eg off audience or presenters
Floor Manager - Responsible for the running of set, respond to director's calls for action
Gaffer - Lighting crew who are on set to change or replace lights.
Actors/Presenters - Follow direction of floor manager, read auto cue and also listen to producers and director.

TV PreProduction: Social Challenge

31/10/16
We were put into groups of half the class and then began looking at the Brief to assign roles to each member of the team. Our show is Social Challenge, a gameshow using ipads and social media to create 10 second story clips and have game show style rounds. 
Sourced from Keeley’s Blogger
'My idea is to use social media to create a game show, there will be two teams of three and each team will compete to create funny and creative images and videos using social sites such as snapchat, tumblr and music.ly. the ages will range from 15-25 and the watershed will be from 9:30pm.'

My role is Productions Design so I will need to produce a design and prop list for Task 1 pre production.

Tuesday, 11 October 2016

'Is It Me Or The Lifestyle?'


An insight to the lifestyle and wife swap of a celeb sportsman's couple and your average couple. Through a reality chat show style , this has pre recorded footage from the week as well as posing our own questions to them.

MultiCam Idea - Pitch


This is my pitch for a TV production in which wasn't picked but got into the top 5 to be chosen.